Projects
10 / ProgrammesTen programmes. What was built, what it took, and what we learned.
Every case below carries the real numbers. Where a programme was lost, or delivered below cost, it says so, because those are the ones that changed how this factory works.
Defence2025-2028200+modules deliveredDefence
Accommodation, corridor and sanitary modules delivered to multiple garrisons under a live multi-year framework, connected into working sets on arrival and accepted formally at each site.
FrameworkRead the case study
Fire & Rescue2018-20256module types, 1 liveryFirefighters
A hook-lift and crane-handled fleet in six functional types and one visual identity for a national fire and rescue service, stackable three high, pressure-washed daily for two decades.
ProgrammeRead the case study
Fire & Rescue2025-20262prototypes to serialFire-training containers
A simple and a complex live-fire training module built from the customer's own CAD, through factory acceptance and shipment, then into a serial pricing structure with 2027 volumes agreed.
PrototypeRead the case study
Hospitality2023-2026100 / 140 / 100 mmwall / roof / floor insulationResort leisure units
Insulated storage and service units for two resort sites, one anthracite for a mountain location and one white for a water park, delivered before the summer season opened.
SupplyRead the case study
Emergency Services20252 × 16module basesEmergency accommodation base
Two identical self-contained 16-container bases with a certified EI 30 rating, corridor-connected sleeping, sanitary, food preparation, storage and technical modules, priced to the tender annex line by line.
Offer & tenderRead the case study
Police & Training2024-20254interconnected modules, EU co-financedPolice training campus
Four interconnected modules delivered as a finished training facility: architectural design, assembly, electrics, HVAC and camera provisions, with the audit trail an EU-funded programme is checked against.
Design & installRead the case study
Defence20264-unitweapon store, offered in 3 daysWeapon storage module
Four weapon storage modules engineered from a written specification with no drawings supplied, two of them joining into one continuous room, priced and offered within three working days of the enquiry.
Offer & tenderRead the case study
Supply chain2026200 × 20 ftsourcedOne-way ISO supply programme
Two hundred 20 ft ISO 1C units sourced for a large storage requirement, with three routes benchmarked and the height, floor and coating specification settled before a single unit was ordered.
SupplyRead the case study
Energy & Cleantech20262,000 kg/m²floor, 200 units a year proposedBattery storage technology container
A complete technical proposal for 20, 40 and 45 ft battery storage enclosures produced without a customer drawing, priced bottom-up, with the capacity consequence and the coating class stated openly.
Offer & tenderRead the case study
Defence / Emergency Services20261 MWinstalled generationDeployable camp system
A whole camp specified and priced as a system: people sleep, wash, eat, keep food cold, have power, fuel, water in and water out, and somewhere to put the spares. Twelve module types, audited against the statement of work.
Offer & tenderRead the case study
- 200+
- modules delivered on a single live defence framework
- 10
- countries delivered to or actively quoted
- 1951
- engineering on this site since
- 6
- management-system and structural certifications held