Technology-grade container modules in the yard
05 / 10

Solutions · family

Data Centers

Pre-tested IT modules: the steel, the envelope and the provisions, engineered around your rack layout.

  • 2,000 kg/m² floors
  • ISO 12944 C4-H / C5-M
  • A1 mineral wool
  • factory-tested before dispatch
  • ISO 9001
  • ISO 14001
  • EN ISO 3834-2
  • EN 1090-1 EXC2
  • AQAP 2110
  • CSC approval
  • Defence trade licence
  • Registered defence supplier, CAGE code held

An edge or modular data centre lives inside a steel shell that has to carry rack loads, keep water out for twenty years, take cable and cooling penetrations exactly where the integrator wants them, and arrive tested. Tanax builds that shell. The IT, the cooling plant and the fire suppression are yours or your integrator's; the enclosure, the structural floor, the coating system and the provisions are ours.

Specification

Shell

Base
new one-way ISO 1CCC / 1AAA high cube, CSC re-inspected with new plate
External
6,058 / 12,192 / 13,716 × 2,438 × 2,896 mm
Structure
EN 1090-1 EXC2, welded EN ISO 3834-2, ISO 9001
Corner castings
ISO 1161 retained, forklift pockets, stackable

Floor

Distributed load
2,000 kg/m² standard
Point load
5,000 kg per pair of rack feet, locally reinforced
Cross-members
C 180 × 70 × 5 at ≤ 300 mm pitch (a standard container is ~460 mm)
Deck
6 mm S355 welded tight, no plywood; forms a liquid-tight tray
Uprated option
3,000 kg/m² available

Envelope

Insulation
100 mm mineral wool, Euroclass A1, λ ≈ 0.035 W/m·K
Internal lining
0.8 mm galvanised sheet on a supporting grid

Coating

Preparation
blast to Sa 2.5 per EN ISO 8501-1
System
Zn-epoxy 80 µm + epoxy MIO 120 µm + PU 60 µm = 260 µm
Durability
ISO 12944 C4-H / C5-M, high durability category

Provisions

HVAC openings
2 (20 ft) or 4 (40 / 45 ft), framed and hooded, ready for your units
Cable transits
HV/LV transit plate with sealed glands
Doors
insulated personnel door with anti-panic hardware
Other
earthing points, data plate, CSC plate, inspection protocol

How it is built

The decisions behind the numbers

Tanax has not yet delivered a completed data-centre module. It has delivered the engineering that one is made of: structural floors, C4-H coating systems, cable transit plates, HVAC frames, ISO-compliant modified shells, under other programmes. This page says exactly that. It converts better than a claim that does not survive a site visit.

The floor is the product.

A standard container floor is plywood on cross-members at roughly 460 mm centres. That is fine for cargo and useless under a rack. Tanax replaces it: C 180 × 70 × 5 cross-members at 300 mm or less, decked with 6 mm S355 welded tight. Two consequences. First, 2,000 kg/m² distributed and 5,000 kg per rack-foot pair. Second, the deck is liquid-tight, so a coolant leak or a suppression discharge stays inside the module.

The coating decides the twenty-year cost.

260 µm in three layers over a Sa 2.5 blast. That is ISO 12944 C4-H to C5-M, high durability. It is materially more expensive than a two-coat system and it is why the module is still a module after two decades outdoors.

Mineral wool, not PIR, and that is deliberate.

PIR gives a better lambda per millimetre. It is also combustible. In an enclosure full of energy the reaction-to-fire class matters more than the last few percent of thermal performance, so the default is 100 mm A1 mineral wool. PIR is available on request where the thermal number is the binding constraint.

Provisions, not plant.

Tanax frames and hoods the openings, plates and glands the cable routes, fits earthing points and mounting positions, and tests the shell. The cooling units, the PDUs, the racks and the suppression system come from you or your integrator and drop into positions that already exist. That split keeps responsibility clean and keeps the price defensible.

Passthrough or non-passthrough changes the product.

A passthrough module has a service aisle, internal lighting, escape hardware and a personnel door. A non-passthrough module has doors along its full length and no aisle, so racks fill the entire volume. It is about six percent of the price on a 20 ft, more on longer units, and it is the first question to settle.

Configurations

Variants and where to find them in the catalogue

  • Modified ISO shells with contrasting corner posts

    20 ft IT module

    • 1CCC HC
    • 2,000 kg/m²
    • 2 HVAC openings
    • passthrough or not
    View SKUs
  • Grey container modules with orange corner posts in the yard, second view

    40 ft IT module

    • 1AAA HC
    • 4 HVAC openings
    • higher steel content in the floor
    View SKUs
  • No photograph yet

    45 ft IT module

    • 13,716 mm
    • pallet-wide option
    • road permit in most EU states
    View SKUs
  • No photograph yet

    Uprated floor variant

    • 3,000 kg/m² distributed, for high-density racks
  • Fitted-out service bay interior

    Shell only, integrator fit-out

    • delivered blasted, coated, insulated, plated and tested

Build detail

What the detail photography shows

  • Grey container modules with orange corner posts in the yard, third view
    Modified shells staged in the yard

Visualisations

Renders and drawings, labelled as such

  • Side elevation drawing of a modified containerDesign drawing
    Design drawingSide elevation of a modified container
  • Side elevation drawing of a modified container with dimensionsDesign drawing
    Design drawingSide elevation with dimensions
  • Visualisation of a technology containerVisualisation
    VisualisationTechnology container concept

Standards

What we build to and what we issue

  • ISO 668:2020 Amd 1
  • EN 1090-1 EXC2
  • EN ISO 3834-2
  • ISO 12944
  • EN ISO 8501-1 / ISO 2808
  • EN 13501-1
  • CSC 1972
StandardWhat it covers
ISO 668:2020 Amd 1Dimensions and designation
EN 1090-1 EXC2Steel structure execution
EN ISO 3834-2Welding quality
ISO 12944Coating durability categories
EN ISO 8501-1 / ISO 2808Surface preparation and coating thickness
EN 13501-1Reaction to fire of the insulation, class A1
CSC 1972Safety approval after modification

Documentation issued

Structural calculation for the floor as built, coating specification and measured thickness report, insulation reaction-to-fire declaration, dimensional inspection, CSC plate and certificate, as-built penetration drawing.

Proof

Deployments with a number in them

  1. 01

    2,000 kg/m² floor with 5,000 kg point loads

    Engineered and priced from the bottom up, material at purchase cost plus co-operation plus direct hours at a fully absorbed rate, for a global electronics manufacturer's technology-container programme.

    Read the case study
  2. 02

    260 µm three-layer coating system

    To ISO 12944 C4-H, already in production use on Tanax's modified ISO work.

  3. 03

    200 units per year

    Modelled as an achievable ramp from month nine, at roughly 44 % of available production capacity in the 20 ft configuration.

Scope

What the price includes, and what it does not

Included

  • Shell
  • Structural floor
  • Insulation and lining
  • Coating system
  • Framed and hooded openings
  • Cable transit plates
  • Doors and hardware
  • Earthing
  • Data and CSC plates
  • Structural calculation
  • Inspection protocol

Not included

  • Racks and IT equipment
  • PDUs and internal electrical distribution
  • Cooling and ventilation units
  • Fire suppression and its certification
  • Delivery to site
  • Third-party structural review beyond our own calculation
If we have not built exactly this before, we will say so and tell you what we have built that is closest. Two prototype programmes in this factory were delivered below cost because nobody said that early enough. We do not do that any more, to you or to us.

Lead times

By variant

VariantLead time
Prototype / first article10-12 weeks from order and drawing approval
Months 1-3 of a serial programme4-6 units per month
Months 4-88-12 units per month
From month 917 units per month, 200 per year

Engagement

Four ways to buy

01

Buy a catalogue unit

Pick from 94 published SKUs with full specifications, get a price, get a delivery date.

02

Modify a catalogue unit

Start from a standard shell and change what needs changing. Fastest route to a non-standard requirement.

03

Build to your specification

You bring the specification or the drawings, we review them, we build. Prototype and serial priced separately.

04

Subcontract fabrication

You are the prime, we are the hall. EN 1090-1 EXC2 capacity with AQAP 2110 assurance behind it.

Process

Specification to delivery in five steps

  1. 01

    Send the specification.

    A drawing, a tender annex, or three sentences. Whichever you have.

  2. 02

    Review, in writing.

    We tell you what is missing or contradictory before anyone quotes. 3-5 working days.

  3. 03

    Quotation.

    Bottom-up: material at purchase cost, co-operation, direct hours at a fully absorbed rate. 2-3 weeks for a complex build.

  4. 04

    Design freeze and build.

    Changes after freeze are variations, priced and agreed.

  5. 05

    Test, document, deliver.

    Factory acceptance where specified, full document pack, delivery and installation where quoted.

FAQ

Questions procurement asks

Have you built a data-centre container before?

Not a completed one. We have built every part of it, structural floors, C4-H coating systems, transit plates, HVAC frames, modified ISO shells with re-issued CSC, under other programmes. We say so up front.

What floor loading do I need?

Tell us the rack weight, footprint and foot positions and we will calculate it, including transport and, where the site requires it, seismic cases. 2,000 kg/m² is our starting point.

Do you supply cooling?

No. We frame, hood and seal the openings and provide the mounting points. The units are yours.

Why mineral wool?

Reaction to fire class A1. In an energy-dense enclosure that matters more than the last few percent of lambda.

Can you hold the price on a long programme?

On volumes above about 200 units a year we recommend fixing price with an indexation clause tied to steel, because material is around 39 % of the cost.

Send us the specification. A drawing, a tender annex, or three sentences.

You will get a written review of it inside a week, whether or not you buy anything.