Battery energy storageTechnical pages

Corrosion protection of the BESS enclosure

A storage enclosure stands outdoors for the life of the asset. The coating system is chosen for the site's corrosivity class and applied in our own paint shop after our own blasting.

Visualisation of a closed BESS enclosure showing the coated envelope, the framed HVAC openings with their hoods and the personnel door
Visualisation

Sa 2.5

Every enclosure is blast cleaned to Sa 2.5 per EN ISO 8501-1 before the first coat. Adhesion is decided here, before any paint is mixed.

Three coats

A Zn-epoxy primer, an epoxy MIO intermediate and a PU topcoat. The system is ISO 12944 C4-H as standard and C5 on request for coastal and industrial atmospheres.

The inside

The inner lining is galvanised steel sheet on a support grid over the 100 mm A1 mineral wool: no exposed insulation, no combustible lining.

Fittings

The ISO 1161 castings are retained, and the earthing points, the data plate and the CSC plate are fitted after coating. The inspection protocol records the coating as applied.

Specification sheet

Specification sheet
Envelope and coating
Insulation100 mm A1 non-combustible mineral wool (EN 13501-1); PIR deliberately not used in battery applications
Inner liningGalvanised steel sheet on a support grid
SurfaceBlast cleaning Sa 2.5 (EN ISO 8501-1); Zn-epoxy primer, epoxy MIO intermediate, PU topcoat; ISO 12944 C4-H standard, C5 on request

Figures are the published specification of the product family, not of a customer's design. Values marked per project are set in the engineering phase.

The specification sheet is generated from the same data as this page. It is sent with the reply to your enquiry and offered for download when the form is submitted.

Request the specification sheet (PDF)

FAQ

Questions procurement asks

Which corrosivity class is standard?

ISO 12944 C4-H. C5 is available on request for coastal and heavy industrial sites.

Is the coating done in-house?

Yes. Blasting to Sa 2.5 and the three-coat system are applied in the Tanax paint shop.

Send the rack weights and the foot layout. The floor is calculated from them.

The structural calculation, the openings and the architecture are settled in the engineering phase. The specification sheet comes with the reply.