Modular building

Multi-cell halls, workforce camp blocks, and sanitary stacks. Engineered for rapid assembly and long-term operation.

What sizes are available in Modular building?

There are 3 items in Modular building. The table below carries the ISO 668 designation, external dimensions, rating R and lead-time band for each of them. The dimensional figures come from ISO 668:2020, Table 2, and are the standard's values rather than a measurement of an individual unit. Items with no fixed dimension set are configured to the order and show a dash instead of a number. Follow a name to reach its detail page, which carries the full specification and the list of figures deliberately withheld.

Modular building · ISO 668:2020
PropertyISO 668 designationExternal length ft (m)External heightRating R (maximum gross mass)Lead time
Modular hall stack----10-16 weeks
Workforce camp block----10-16 weeks
Sanitary block----10-16 weeks

Source: ISO 668:2020 ·

3 results