Five container families, one production line.

Same hall, same welders, same paint booth. Switching between families is a process question, not a capability question.

ISO Standard

20 ft and 40 ft dry cubes, ISO 1CC stackable, CSC plate on every unit.

Marine-grade weldments out of EXC2 steel, painted to C3 corrosion class. Standard freight, fleet pool, on-site storage. Catalog or call-off.

20 ft / 40 ftISO 1CC stackableCSC plateEXC2 steel
Typical use · Storage, transport, fleet pool
Explore the family

Office & Living

Site offices, accommodation, command posts. 6058 × 2438 × 2800 mm external.

PIR sandwich panel envelope, electric or split A/C climate, single-room or double-stacked layouts. Optional en-suite, kitchenette, IT prep. Used on construction sites, defense camps, ski resorts.

6058 × 2438 × 2800 mmPIR sandwichElectric heat + A/CEn-suite optional
Typical use · Site offices, accommodation, command posts
Explore the family

Sanitary & Septic

WC, shower, laundry, kitchen modules. Septic and water tanks from 2 to 10+ m³.

Stand-alone sanitary blocks for field camps, emergency response, base support. Plumbing routed, water heater, freshwater in / grey-water out connections. Septic and water tanks tested and certified.

Multi-stall WC / showerWater heaterSeptic 2–10 m³Hot-dip galv option
Typical use · Field camps, emergency response, base support
Explore the family

Special Purpose

Firefighting, fuel, training, ITCC, MELIDA-style accommodation. EI 30 / REI 30 on request.

Fire-rated walls and roof, specialised internal layouts, smoke-rated structural detail for live-fire training modules. Built for fire and rescue, military training, emergency accommodation.

EI 30 / REI 30 fireSmoke-rated detailAQAP 2110NATO CAGE 4094M
Typical use · Fire & rescue, training, emergency, defense
Explore the family

Custom (B2G, B2C, B2B)

Your drawings, our engineering review and production. EXC2 steel to EN 1090.

Most B2G work runs through this track: command posts, dog kennels, equipment shelters, branded retail kiosks, industrial sub-assemblies. RAL 3000 / 5010 / 7016 standard, hot-dip galv on request.

EN 1090 EXC2RAL 3000 / 5010 / 7016Hot-dip galv optionEngineering review included
Typical use · Defense, public security, retail, industry
Explore the family

Engagement models

Four ways to work with the hall.

Catalog purchase

Standard ISO, office, sanitary, storage. Lead time 6–10 weeks. EXW Bánovce nad Bebravou as default, DAP on request.

Custom build to spec

Your drawings, our engineering review and production. Welded, painted, fitted out, delivered. Most B2G work runs this way.

Framework / call-off

Multi-year framework with periodic call-offs. Structure used for the active military framework. Pricing locked, lead time held.

Subcontract under prime

European steel and integration partner under your prime. EN 1090 EXC2 fabrication, paint, assembly to your QA.

Process

Specification to delivery in five steps.

  1. 01

    Specification

    Use case, dimensions, finishes, certifications, delivery window. NDA in 24 hours if needed.

  2. 02

    Quotation

    Engineering review, fixed price, lead time. Typical 3–5 working days for standard families.

  3. 03

    Engineering

    Shop drawings, BOM, weld procedures (WPS / PQR). Customer sign-off gate before steel cut.

  4. 04

    Production

    Cut, weld (ISO 3834-2), blast (Sa 2.5), paint, fit-out. FARO 3D measurement at QA.

  5. 05

    Delivery

    EXW Bánovce as default. DAP and DDP on request. CMR, CSC plate, multilingual manuals on handover.

06 / Process

From inquiry
to delivered container.

Catalog6–10 weeks
Custom10–16 weeks
Framework call-offas agreed
  1. 1Step

    Specification

    Use case, dimensions, finishes, certifications, delivery window. NDA in 24 hours if needed.

  2. 2Step

    Quotation

    Engineering review, fixed price, lead time. Typical 3–5 working days for standard families.

  3. 3Step

    Engineering

    Shop drawings, BOM, weld procedures (WPS / PQR). Customer sign-off gate before steel cut.

  4. 4Step

    Production

    Cut, weld (ISO 3834-2), blast (Sa 2.5), paint, fit-out. FARO 3D measurement at QA.

  5. 5Step

    Delivery

    EXW Bánovce as default. DAP, DDP on request. CMR, CSC plate, multilingual manuals on handover.

Catalog
6–10 weeks
Custom build
10–16 weeks
Framework call-off
As agreed

Talk to the hall

Have a specification? We respond in three to five working days.