SANITARY AND SEPTIC
Field-camp hygiene in welded steel, ready to deploy
WC, shower, laundry and kitchen blocks plus septic and fresh-water tank containers. Self-contained or mains-connected. Built to the same EXC2 steel chain as our ISO line in Bánovce nad Bebravou.
- Modules
- WC / shower / laundry
- Tanks
- 2 to 10+ m3
- Water
- Heater + fresh/grey
- Finish
- Hot-dip galv opt.
At a glance
- Modules
- WC / shower / laundry
- Tanks
- 2 to 10+ m3
- Water
- Heater + fresh/grey
- Finish
- Hot-dip galv opt.
Overview
Overview
We produce, supply, and customise nearly anything to your specification. Within the Sanitary and Septic family that means the full range of hygiene and water types: WC blocks, shower blocks, combined WC and shower units, washrooms, laundry blocks, kitchen and catering modules, septic tanks, water tanks, grey and blackwater tanks, and accessible sanitary cells. WC blocks come in gents, ladies and accessible variants. Units run stand-alone where there is no mains connection, or hook directly into base water and sewer when there is. The shell is the same 20 ft ISO 1CC envelope used across our other families, which keeps transport, lashing and stacking identical to a dry cube. Internal fit-out is sealed, ventilated and finished to hygienic wet-area surfaces.
The same line delivers this family at scale into government fire and rescue programmes, in fire-service red and hot-dip galvanised with a 24-month warranty on the steelwork, and builds units that ship to defence bases and emergency-accommodation programmes across the region. Whatever the duty, the type taxonomy stays open: any function in the list above can be specified, combined and finished to the deployment.



Build standard
Construction and materials
Frame
hot-rolled steel, EN 1090-1 EXC2 chain, welded under EN ISO 3834-2.
Skin
1.6 mm corrugated steel or PIR sandwich panel where insulation is required for year-round use.
Wet-area lining
glass-fibre-reinforced sheet or HPL panel sealed at every joint with sanitary silicone.
Floor
anti-slip R10 finish in WC and shower cells, R11 in the shower tray. Underlay is hot-rolled steel cross-members.
Shower tray
stainless steel or moulded GRP with central drain and seal.
Drainage
DN 100 main drain to a gravity manifold on the long side. Internal pipework in PP-H or PVC-U, all joints accessible from a service void.
Hot water
electric storage boilers, 30 L for hand-wash points, 80 L per shower cell, or a single 300 L 6 kW unit feeding a shower block of four to six heads.
Ventilation
mechanical extraction over WC and shower cells at a minimum of 8 air changes per hour, with a passive louvered intake. Powered roof fans on the laundry and kitchen variants.
Electrical
PN-HD 60364 distribution board, 32 A or 63 A CEE inlet, RCBO per circuit, IP44 fittings in wet areas, IP65 outside. LED panels throughout.
Insulation (heated variant)
100 mm PIR walls and 140 mm PIR roof, 100 mm mineral wool floor where the unit will overwinter on site.
Doors
1.6 mm steel external doors with EPDM gasket. Internal cubicle partitions in HPL with anti-vandal hinges and indicator locks.
Backflow protection
DIN EN 1717 compliant inlet group on the fresh-water side. Mandatory where the unit can be cross-connected to a non-drinking line.
Surface preparation
ISO 8501 Sa 2.5 in our own blast booth. Two-coat system rated to C3 corrosivity per EN ISO 12944.
Livery
catalog colours are RAL 3000 (fire-service red), RAL 5010 (gentian blue) and RAL 7016 (anthracite). Hot-dip galvanised steelwork on request, as supplied to fire and rescue programmes.
Specifications
Dimensions and tolerances
External envelope and corner-fitting tolerances meet ISO 668 and ISO 1496-1 so the unit can be lifted, stacked and transported on the same chassis as a dry cube. Each unit ships with a unique BIC code, CSC plate, multilingual handover manual and an as-built drawing of the plumbing and electrical loops.
| 20 ft sanitary block | 20 ft tank container | |
|---|---|---|
| External length | 6058 mm | 6058 mm |
| External width | 2438 mm (standard) or 2990 mm (wide) | 2438 mm |
| External height | 2591 mm or 2896 mm | 2591 mm |
| Internal headroom | 2300 to 2500 mm | n / a |
| Floor area | 14.8 m² (standard) or 18.1 m² (wide) | n / a |
| Septic holding tank | n / a | 1000 to 5000 L |
| Fresh-water tank | n / a | 1000 to 2500 L |
| Max gross | 12 000 kg | 14 000 kg |
| Tare (typical) | 4500 to 6500 kg | 2800 to 4200 kg |
Certified
Certifications and norms
- ISO 668 (envelope and corner fittings)
- ISO 1496-1 (specification and testing of the shell)
- ISO 1CC corner casting, stackable per ISO 3874
- CSC plate (Container Safety Convention 1972)
- EN 1090-1 EXC2 (execution class for steel structures)
- EN ISO 3834-2 (welding production-level)
- ISO 8501 Sa 2.5 (surface preparation)
- EN ISO 12944 C3 (corrosivity protection)
- PN-HD 60364 (low-voltage electrical installation)
- DIN EN 1717 (backflow prevention on the fresh-water inlet)
- EN 12566-1 alignment for prefabricated septic holding tanks where the customer specifies a treatment-grade unit
- AQAP 2110:2017 for NATO and Slovak MoD orders
- 24-month warranty on the steelwork, in line with the fire and rescue delivery standard
Deployment
Typical use cases
Field camps and forward operating bases
A WC block, a shower block, a 1000 to 2500 L fresh-water tank container and a 3000 to 5000 L septic holding tank cover a 50 to 100 person camp without mains connection. Refilling and pumping run on a scheduled tanker rotation.
Configure
Customisation options
three-cubicle gents with two urinals, three-cubicle ladies, plus a separate accessible cell to a 1500 mm turning circle.
Lead time
Lead time and delivery
Catalog configurations
6 to 10 weeks
6 to 10 weeks ex works Bánovce nad Bebravou.
Custom build to spec
10 to 16 weeks
10 to 16 weeks. Engineering review and customer sign-off gate before steel is cut.
Framework call-off
as agreed in the framework. Pricing and lead time held against the contract baseline.
Delivery on EXW Bánovce by default
DAP and DDP on request, with multilingual CMR, CSC plate and a handover manual covering plumbing, electrical and tank service.
Proven in service
Reference deployments
ISO containers for the Slovak government fire and rescue sector
- Client
- Slovak government
- Year
- 2018 to 2025
A multi-year sanitary, laundry, tank and platform programme in RAL 3000 livery. ISO 1CC stackable bodies, hot-dip galvanised undercarriage, 24-month warranty.
View project →Emergency accommodation bid for Czech government civil protection
- Client
- Czech government
- Year
- 2025
EXC2 steel, EI30 fire resistance, PIR sandwich roof, RAL 5010 frame. Built around the operational tempo of an integrated rescue system call-up.
View project →Defense-sector containers delivered under an active government framework
- Client
- Slovak government
- Year
- 2025-2028
A multi-year framework with the Slovak government across the 2025-2028 cycle, with follow-on orders already signed for 2026.
View project →FAQ
FAQ
Send a specification. Get a fixed quote.
Engineering review included. Quotation turnaround is 3 to 5 working days for standard configurations.