HOSPITALITY AND LEISURE
Resort accommodation that ships in winter and opens for season
Two-floor staff housing, aqua-park season cabins and hotel back-of-house, engineered to each operator's brief and delivered ready to connect.
- Fire
- REI 30
- Steel
- EXC2
- Frame
- RAL 7016
- Envelope
- PIR sandwich
At a glance
- Fire
- REI 30
- Steel
- EXC2
- Frame
- RAL 7016
- Envelope
- PIR sandwich
Overview
Sector brief
Hospitality and leisure is the most seasonal customer set we serve. The clock is the building. A ski resort that misses its opening weekend loses a full revenue window; an aqua park that opens late on the May bank holiday loses every booking that was made nine months in advance. Container accommodation lets a resort operator decouple the building programme from the calendar of the mountain. We deliver welded, painted and fitted-out units that arrive on a low-loader, sit on a prepared pad and are connected to services within days rather than months.
For this sector we supply the full range a resort needs and customise every unit to the operator's exact requirement: two-floor staff accommodation buildings, single-storey season cabins for aqua-park and lakeside settings, hotel back-of-house support, reception and ticketing modules, and base-camp clusters for expeditions, productions and crews. Everything exits the same paint booth in Bánovce nad Bebravou that serves our defense and public-security work. The hardware register is the same. The dossier register is the same. What changes is the finish schedule, the fire rating and the seasonality of the call-off, all of which we set to the brief in front of us.


Compliance
Compliance and specification path
- REI 30 fire resistance on the accommodation structure under EN 13501-2. Adequate for two-storey staff housing in resort settings and specified on demanding accommodation builds.
- PIR sandwich panels for the roof and walls on insulated accommodation cells. Mineral wool on lighter season cabins.
- ISO 8501 Sa 2.5 surface preparation. EN ISO 12944 C3 anti-corrosion coating system, suitable for the moderate-corrosivity exposure typical of alpine and lakeside installations.
- ISO 3834-2 welding process feeds the EXC2 line.
- PN-HD 60364 low-voltage electrical design for the in-cell sockets, lighting and AC feed.
- ISO 9001 quality and ISO 14001 environmental management throughout.
- EN 1090-1 EXC2 execution for the steel envelope: Same execution class as our defense and public-security work.
Documentation on handover follows the same structure we use for B2G work: per-unit weld procedure references, EN 10204 material certificates, paint dry-film thickness records, FARO 3D geometric inspection where the building geometry warrants it, multilingual manuals and the warranty pack.
Proven in service
Reference deployments
Czech Republic, ski-resort operator
- Multiple containers configured as a two-floor staff accommodation building
- External dimensions per cell: 6058 × 2990 × 2800 mm
- Internal clear height: 2500 mm
- Structure: EXC2 steel, ISO 8501 Sa 2.5, EN ISO 12944 C3 anti-corrosion paint, RAL 7016 frame
- Envelope: PIR sandwich panels on roof and walls
- Fire resistance: REI 30
- Climate: electric heating with a 2.6 kW air-conditioning unit per cell
- Use case: winter-season ski-resort staff accommodation, two storeys
Slovakia, mountain and leisure-resort operator
- External dimensions per unit: 6055 × 2435 mm
- Insulation build-up: 100 mm wall, 140 mm roof, 100 mm floor mineral wool
- Use case: leisure-season modules for an aqua-park and a mountain location under the same operator
- Deployment register: standard 2435 mm width for compatibility with existing resort pads and lifting equipment
Deployment
Typical container configurations for hospitality
Staff accommodation, two-storey, REI 30
PIR sandwich envelope, internal partitions, en-suite or shared sanitary, electric heating, per-cell AC. Sized to the operator's room standard.
How we work
Engagement model
Two of our four engagement models fit hospitality and leisure cleanly:
Your architect's drawings or the resort's standardised cell layout. Engineering review in 3 to 5 working days. Production runs against a fixed price and a fixed lead time. Most resort work runs this way.
Framework call-off is available where a resort group is provisioning capacity across multiple sites under one operator and wants pricing and slots locked across a multi-year window. This is the structure that suits a multi-site resort group or a chain hotel operator.
Lead time
Lead times
Catalog season cabin or back-of-house module
6 to 10 weeks
6 to 10 weeks.
Custom build to spec, including staff accommodation
10 to 16 weeks
10 to 16 weeks from engineering sign-off.
REI 30 detailing and PIR sandwich envelope
included in the custom lead time, no surcharge on the slot.
Two-storey configurations
1 to 2 weeks
add 1 to 2 weeks for stair core and inter-floor structural work.
Production runs through winter. A January engineering sign-off comfortably reaches a May opening on a leisure project, or a November opening for a December-start ski season on the larger staff accommodation builds.
FAQ
FAQ
Send a specification. Get a fixed quote.
Engineering review included. Quotation turnaround is 3 to 5 working days for standard configurations.